Skip to content

Kitchens and bathrooms

Building Regulations: Suitability of existing floor structures

If the use of a room is changed and could result in the load (weight) on the floor structure changing significantly work to strengthen the floor may be necessary.

For example, if a new bathroom suite is installed in a room where the floor structure is constructed of timber joists and boards, there is a significant risk of the floor being overloaded from the bath once it is full of water and in use. Therefore, work may be needed to strengthen such a floor.

A structural engineer or surveyor can assess the floor and determine this for you. If the floor does need to be strengthened they can produce the paperwork that a building control body will require before you commence the work.

Find a Trade Professional

Use our partner directories to find a planning or building professional to help with your project or development.

Find a professional


Useful links

Make an application Speak to an expert Studio Charrette planning consultancy calculator Sell your site with Land Match

      The Planning Portal is delivered by PortalPlanQuest Limited which is a joint venture between TerraQuest Solutions Limited and the Ministry of Housing, Communities & Local Government (MHCLG). All content © 2025 Planning Portal.

      The Planning Portal is delivered by PortalPlanQuest Limited which is a joint venture between TerraQuest Solutions Limited and the Ministry of Housing, Communities & Local Government (MHCLG). All content © 2025 Planning Portal.