Biomass fuelled appliances
Planning permission
Planning permission is not normally needed when installing a biomass system in a house if the work is all internal. If the installation requires a flue outside, however, it will normally be permitted development if the conditions outlined below are met.
- Flues on the rear or side elevation of the building are allowed to a maximum of one metre above the highest part of the roof.
- If the building is listed or in a designated area even if you enjoy permitted development rights it is advisable to check with your local planning authority before a flue is fitted. Consent is also likely to be needed for internal alterations.
- In a conservation area or in a World Heritage site the flue should not be fitted on the principal or side elevation if it would be visible from a highway.
If the project also requires an outside building to store fuel or related equipment the same rules apply to that building as for other extensions and garden outbuildings.
Find a Trade Professional
Use our partner directories from CIAT, FMB or RTPI to find an chartered architectural technologist, builder or planning consultant to help with your project or development.
Find a professional (https://www.planningportal.co.uk/planning/planning-applications/find-a-trade-professional)
Find a professionalUseful links
Make an application (https://www.planningportal.co.uk/app/applications)
Make an applicationStudio Charrette planning consultancy calculator (https://www.planningportal.co.uk/permission/home-improvement/planning-consultancy-calculator)
Studio Charrette planning consultancy calculator- https://www.planningportal.co.uk/permission/common-projects/extensions
- https://www.planningportal.co.uk/permission/common-projects/outbuildings