Part S - Infrastructure for charging electric vehicles
Approved Document S
Publication title: Approved Document S: infrastructure for charging electric vehicles
Date published: December 2021
Date valid from: 15 June 2022
Summary
Approved Document S provides technical guidance regarding the installation and charge point requirements for electric vehicles (EVs) in Part S to the Building Regulations.
It applies to new residential and non-residential buildings; buildings undergoing a material change of use to dwellings; residential and non-residential buildings undergoing major renovation; and mixed-use buildings that are either new, or undergoing major renovation.
This approved document is for use in England.
Download
The Merged Approved Documents1.
A consolidated version of the individual Approved Documents published by the government, now presented as a single, searchable PDF.
Non-consolidated version
Approved Document S: infrastructure for charging electric vehicles2. This approved document takes effect on 15 June 2022.
Approved document S: frequently asked questions3.
Useful links
Start a building control application1
- https://www.planningportal.co.uk/app
- https://www.gov.uk/guidance/building-regulations-and-approved-documents-index#approved-documents
- https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1057375/AD_S.pdf
- https://eur01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.gov.uk%2Fguidance%2Fapproved-document-s-infrastructure-for-charging-electric-vehicles-frequently-asked-questions%3Futm_medium%3Demail%26utm_campaign%3Dgovuk-notifications-topic%26utm_source%3D62333b95-ac4c-4b7f-9c1a-15a21634e1d0%26utm_content%3Ddaily&data=05%7C01%7CSapphire.Plant%40planningportal.co.uk%7C937204a1d6f84820099408db3ff4b7c6%7Cb44d4bd81c0444de8ebb5be527ff0ffb%7C1%7C0%7C638174092504130443%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=dEGWPK2rsksfVzcxGeqtqTU0Bp5z7TkeczCGSmNiz8s%3D&reserved=0